ACTIVITIES

 Year  Phase  Activity
2014  Phase I Study for the development of the experimental  model of innovative fertigation equipment  
     Activity I.1 Elaboration of the study for the development of  experimental model of innovative fertigation equipment
 Activity I.2 Partial design of experimental models of fertigation equipment
 Activity I.3 Elaboration of technologies for fertigation of vegetable crops in protected areas
2015  Phase II Designing, developing, testing the experimental model of fertigation equipment and laboratory technology. Elaborating the technologies for fertigation of horticultural crops in protected areas and fruit crops. Dissemination of results  
     Activity II.1 Design of experimental model of fertigation equipment, elaboration of EM testing guidelines. Design of laboratory technology
 Activity II.2 Elaboration of technology for fertigation of fruit crops
 Activity II.3 Developing parts of Experimental model of fertigation equipment (the block of valves for injecting primary solution)
 Activity II.4 Developing parts of Experimental model of fertigation equipment (the primary solution injector); partial development of subassemblies
 Activity II.5 Developing parts of Experimental model of fertigation equipment (the pipe connecting the fertigation equipment to the irrigation facility, the system for monitoring the injection process, the container for fertilizer with related accessories)
 Activity II.6 Dissemination of results
 Activity II.7 Testing of fertigation equipment under laboratory conditions
2016  Phase III Elaboration of reference documentation on the fertigation equipment. Dissemination of results  
     Activity III.1 Development of parts (block of primary solution injection valves) for Experimental model of fertigation equipment. Final assembly
 Activity III.2 Development of parts (primary solution injector) for Experimental model of fertigation equipment. Final development
 Activity III.3 Development of parts (injection process monitoring system, fertilizer tank with corresponding accessories) for Experimental model of fertigation equipment
 Activity III.4 Development of fertigation equipment test stand
 Activity III.5 Tests on the fertigation equipment under laboratory conditions
 Activity III.6 Demonstration of functionality and utility of fertigation equipment EM
 Activity III.7 Protection of intellectual property rights
 Activity III.8 Dissemination and valorification of project results
 Activity III.9 Elaboration of fertigation equipment reference documentation
 Activity III.10 Design of fertigation equipment prototype
 Activity III.11 Development of parts (block of primary solution injection valves) for fertigation equipment prototype
2017  Phase IV Design, development, testing of the fertigation equipment prototype. Dissemination of results  
     Activity IV.1 Development of parts of the Fertigation equipment prototype (the primary solution injector)
 Activity IV.2 Development of parts of the Fertigation equipment prototype (the pipe connecting the fertigation equipment to the irrigation facility, the system for monitoring the injection process, the container for fertilizer with related accessories)
 Activity IV.3 Testing of the fertigation equipment prototype in operating conditions
 Activity IV.4 Dissemination and valorification of project results (publishing papers in the scientific flow)